IELTS Reading: True/False/Not Given and Yes/No/Not Given
Question 1 of 5
Time left: 00:00
Free IELTS Reading Q & A Practice 1 of 5 free IELTS-standard exercises in this section
Reading passage
Taming the Colorado

AHoover Dam, on the Colorado River between Nevada and Arizona, was one of the largest construction projects of the Great Depression. Work began in 1931, and the dam was completed in 1936, two years ahead of schedule.

BIts scale created unusual problems. Concrete gives off heat as it sets, and engineers calculated that a structure of this size, poured in a single block, would take about 125 years to cool and would crack as it did so. Instead, the dam was built as a series of separate columns, and cold water was pumped through more than 580 miles of steel pipe embedded in the concrete (Figure 1).

CThousands of men sought work on the project at a time when jobs were scarce. A new town, Boulder City, was built to house them. Officially, 96 workers died in accidents during construction.

Lake MeadColorado River726 feethighcooling pipes in concrete
Do the statements agree with the information in the passage?
1The dam was finished later than originally planned.
2Without the cooling system, the concrete would have taken more than a century to cool.
3Workers on the dam earned more than the national average wage.

Which option gives the correct answers (TRUE, FALSE or NOT GIVEN) for statements 1 to 3?
Select one option.
You have used 0 of 1 attempt
Next ▶